TEL +81-3-3245-0088Toyo Building, 1-2-10 Nihonbashi, Chuo-ku, Tokyo
Second-Stage Energy Savings

Beyond LED Conversion

Once lighting has been upgraded to high-efficiency LEDs, the next step is to optimize operating hours, illuminated areas and the way lighting is used. We aim for further reductions through intelligent control while making the most of existing equipment.

Why control comes after LED conversion

LED conversion substantially lowers power consumption. However, facilities that continue lighting unoccupied areas or remain fully lit when daylight is sufficient still have operational savings potential. Second-stage energy saving means moving from equipment replacement to control that uses lighting only where and when it is needed.

Primary Approaches

Occupancy Control

Detect movement and occupancy to control illuminated areas and brightness automatically.

Daylight-Linked Control

Reduce unnecessary output in response to natural light and surrounding illumination.

Schedule Control

Control lighting in line with business hours, operating schedules and days of the week.

Potential

Reduce lighting energy consumption to
1/3–1/10 of previous levels.

Our goal is to eliminate unnecessary lighting and reduce electricity use while maintaining required illumination and safety.

Actual savings vary depending on equipment condition, usage patterns and control methods.

Suitable Applications

Hotels & back-of-house areasUnderground parkingWarehouses & logistics facilitiesHospitals & medical facilitiesCommon corridorsRestrooms & stairwaysMechanical rooms
Planning

The goal is not simply to install sensors, but to optimize operation.

We review traffic patterns, lighting circuits, minimum illumination requirements, safety and user convenience, then design the most appropriate control method for each area.

Available control methods depend on existing equipment specifications and site conditions. We develop a specific proposal after conducting a site survey.
1Site SurveyReview lighting and actual use
2Control DesignSelect the best method for each area
3Installation & SetupEnsure safety and ease of use
4VerificationCompare data before and after implementation
Next Step

First, we identify where savings are possible.

Tell us what you know about the facility, current equipment and lighting conditions.